<< Back

About service   Jobs 

  1. Setting the floor / m2
  2. Parquet sanding / m2
  3. Varnished parquet / m2
  4. Polishing the floor A/m2
  5. Setting the parquet skirting / m
  6. Paint the baseboards
  7. Setting mosaic flooring / m2
  8. Laminate / m2
  9. Laminate strips / m
  10. Straightening walls construction adhesive
  11. Plastering machine
  12. Plastering manually
  13. Skimming walls and ceilings
  14. Painting dispersion
  15. Painting with special colors
  16. Setting up wallpaper
  17. Making Spanish wall
  18. Painting doors
  19. Painting a radiator
  20. Work on the rope in the final construction work
    (where setting up scaffolding inaccessible and unprofitable)
  21. Facade work (material, the use of scaffolding or tower)
  22. Making demit facade (styrofoam, mesh, construction adhesive, facade)
  23. Making tarolit facade (tarolit, mesh, construction adhesive, facade)
  24. Making tarolit facade (tarolit, wire mesh, cement mortar, the facade of your choice)
  25. Facade of natural stone
  26. Making Hirofa facade
  27. Making gebane facades: the grit of 1.2 and 3, above, below, to the side
  28. Making the facade (large, small)
  29. Set the brick facade
  30. Height facade works (whitout material with rope)
  31. Height facade works - repair of damaged (material, with rope)
  32. Production of thermal insulation: Insulation sandwich, cane, wool (Vunizol) Tarolit, polystyrene
  33. Masonry walls (brick, block, gas concrete, plasterboard with insulation)
  34. Demolition of interior walls
  35. Removal of the facade
  36. Removal of tiles
  37. The amount of debris and garbage to the dump
  38. Setting up windows (PVC, aluminum, wood, metal)
  39. Concreting floors
  40. Setting the grid plate
  41. Setting concrete drains
  42. Setting curb
  43. Setting concrete products – other
  44.  Edge details after installing windows, armored doors
  45. Production of terrazzo
  46. Masonry manhole
  47. Masonry reinforcement pad (shoe) steel construction advertisements
  48. Walling fountain
  49. Making tracks - printed concrete
  50. Walled up, setting fabricated fountain
  51. Masonry baking furnace
  52. Walled up grill outside
  53. Unique masonry fireplace
  54. Setting fire
  55. Walling garden resting – tents
  56. Masonry boxes for domestic pets
  57. Masonry pool with the addition of hydrophobia
  58. Unloading and transfer of materials and tile work location (floor by floor)

 

CERAMIC WORKS

 

  1. Ceramic works: setting wall tiles with cement mortar
  2. Ceramic works: setting wall tile with construction adhesive
  3. Install ceramic plinths, factory-made
  4. Install ceramic tile cutting plinths
  5. Setting factory made ​​borders
  6. Setting a border cutting board
  7. Tiling miter
  8. Laying tiles with skirting
  9. Tiling around the pillars
  10. Ceramic works: installation of floor tiles with cement mortar
  11. Ceramic works: installation of floor tiles diagonally with mosaic
  12. Ceramic works: Floor tiles on stairs miter
  13. Ceramic works: Floor tiles on stairs with nail
  14. Ceramic works: Floor tile with construction adhesive

 

MASONRY WORK

  1. Masonry shower and tub
  2. Creating unique mosaic (floor)
  3. Creating unique mosaic of garden furniture
  4. Creating unique mosaic (house bar, a fireplace, wall - concrete equipment)
  5. Creating unique mosaic (furniture - ROLL technique)
  6. Creating unique mosaic (terrazzo technique)
  7. Production of construction joinery: Wood - oak; fir
  8. Installation of PVC doors, windows, partitions
  9. Installation of aluminum joinery
  10. Editing and production of metal joinery
  11. Making the closet of panel
  12. Making America's closet
  13. Production of built-in closets
  14. Making kitchen
  15. Preparation and shoe hanger
  16. Design and installation of unique PVC and aluminum shower enclosure with 6mm tempered glass with frosted FLOT motif on the glass if desired

STONE WORKS

  1. Setting up of marble slabs
  2. Setting up granite slabs
  3. Processing of marble edge
  4. Polishing marble
  5. Waxing marble

PLUMBING INSTALLATION WORKS

  1. Development of water supply (plastic water) heat pipe connection (iron)
  2. Development of water supply (plastic water) connecting pipe glue
  3. Setting HDPE pipes in the ground
  4. Water network of galvanized pipe - standard method
  5. Setting internal drainage PVC pipe
  6. Setting internal drainage steel pipes
  7. Setting the external drainage tube
  8. Setting (assembly) of all kinds of sanitary ware:
  9. water heater, water tank, heater, shower, tub, toilet, sink, toilet seats, taps
  10. Masonry shaft connecting the meter
  11. Brickwork drainage pits
  12. Masonry sewer septic tank

LOCKSMITH

  1. Creating unique wrought iron
  2. Creating unique fences - fences copper
  3. Making canopies
  4. Glazing balconies (PVC, aluminum, wood)
  5. Production of metal doors and windows
  6. Steel structures

ELECTRICAL INSTALLATION IN PROJECT

  1. Surface-mounted home installations (buildings, warehouses, fattening facilities, etc.).
  2. Concealed house installation
  3. Making external installations (street lamps and garden lighting installations)

HEATING SYSTEM

  1. Setting heaters
  2. Set the boiler
  3. Cistern
  4. Set the pipe network (copper, black pipe)

SANDBLASTING

  1. Steel structures
  2. Sandblasting and painting the pole next to the road
  3. Miscellaneous

SMALL REPAIRS

  • Water supply, sanitation, washing machines and vessels:
  1. Replacing the faucet, wall charger, standing batteries, the instantaneous water heater, valves, swivel, shower hoses, shower handles, rubber and wire routing
  2. Replacement of high and low mounting assembly stew, duck, bell EC valves, flexible hoses, puller, adjust levels, replacement flush pipe
  3. Replacing a toilet on the same hole, toilet seat, tightening the board, replacing tires on the toilet, replacing rubber flooring, fixing a cup, drain replacement tires Baltic, replacing the sink - the same type, the same hole
  4. Upcork of bathtub drains, sink drains, sink drains, cleaning siphon, siphon replacement, replacement puller, replacing rubber on the siphon
  5. Levelling the washing machine, filter cleaning washing machines, replacing the inlet pipe of washing machines and replacing drainage pipes of washing machines
  • Electrical works:
  1. Replacing fusible fuse, circuit breaker, contact screws
  2. Replacing the lamp holder, lamp, lamp holder repairs
  3. Hanging chandeliers - lamps, wall lamps, hanging
  4. Replacing wall sockets (various), OG wall switch, key rings, indicators for bathroom socket 220-380W
  5. Replace the whole cable, switch on cable, hooks
  • Carpentry:
  1. Small fix (without painting), sealing, replacement Anuba hinge replacement clap hinges, adjustable hood closets, replacement locks for wooden doors, locks for metal doors, intercom replacement locks, cylinder locks, fixing door handles, replacement Sidle
  2. Repair of drawers
  3. Roller blinds: replacement risers, upjam, replacement machines, rolls, mechanisms – lower
  • Other works:
  1. Drilling holes in the concrete wall (a hole up to 40mm)
  2. Hanging pictures (per hour)